Featured Projects
Hannaford Distribution Center
This project consisted of paving a new 90,000 SF parking lot and multi use trail for this expanding hotel chain. Located in the proximity to the largest bustling mall in the Albany area.
19th Street – Watervliet
This hard-bid project consisted of roadway reconstruction of Whitehall Road, Ten Broeck Street & Cardinal Ave. The scope of work included new ADA compliant sidewalks, granite curbing, full depth milling and full depth asphalt.
Edison Golf Club
This project along Luther Road in East Greenbush called for new pavement area, including curb, pavement and enclosed drainage.
Walmart Supercenter
At almost 450,000 SF of removal and replacement, this parking lot project took the crews about 2 weeks to complete. All trades work together from one end of the site to the other, constantly in motion like dominoes. With non-essential projects resuming from the NY Pause, crews resume round the clock efforts to catch up and maintain project schedules. This routine is normal for the crews in peak season as they do what it takes in our industry that is seasonal and highly dependent on weather conditions. Very proud of our crew.
Read More Lake View Terrace
A short road doesn’t mean an easy paving job! This quaint street in Bolton Landing was a challenge for the crew, from narrow sides to a steep and winding route.
Street Resurfacing and Sidewalks
This contract involved more than 15 Albany City streets and locations to resurface pavement, reconstruct sidewalks, replace or reset granite curbing, construct or reconstruct concrete and ADA ramps, striping and sign installation. The biggest challenge involved is working in public areas that cannot be shut down. The goal remains public safety as well as to get in and out with little disruption and inconvenience to the city residents.
Schenectady Street Improvements
This awarded contract covered the improvements of 12 city streets throughout Schenectady, NY. Crews skillfully maneuvered through the historical portions of the Stockade District and beyond for an amazing outcome for the residents and business owners. Some of the details included new 18″ curbing and sidewalk inlays at intersections.
Watervliet Bike Path Connection
This project expanded the Mohawk-Hudson Bike-Hike Trail for 1.85 miles along Broadway from the 4th Street Trailhead to Hudson Shores Park. It includes the installation of an asphalt bike path, subbase, ADA compliant curb ramps, concrete curbs, drainage improvements, signing, striping and pedestrian signals. Work was completed by the end of summer 2020. A fabulous project completed locally.
Read More Presidential Estates
We are very proud to offer Milling & Paving services throughout the Capital District and beyond for our many core clients. We understand that our work is a direct representation of the properties that we maintain.
Read More South Troy Industrial Road
The extension of East industrial Parkway includes more than just paving a new road with sidewalks. Crews will also excavate and prep 1,600 feet of vacant land for the new roadway, dispose of 4,000 tons of contaminated soils and install 16″ water line including catch basins and light pole bases.
Read More