Halfmoon Water District No 1 Replacement

Owner: Town of Halfmoon

Peter Luizzi & Bros worked closely with Engineer CHA Consulting, Inc on the replacement of approximately 10,000 linear feet of existing water main with 8” & 12” DIP water main including hydrants, valves, water services, fittings, associated appurtenances and related site work. Additionally, there were (2) below grade pressure reducing valve vaults. Along with working in the front yards of many town residents, the team also performed a bore underneath the active railroad tracks with the assistance of CP Rail.