Watervliet Bike Path Connection
Owner: City of Watervliet
This project expanded the Mohawk-Hudson Bike-Hike Trail for 1.85 miles along Broadway from the 4th Street Trailhead to Hudson Shores Park. It includes the installation of an asphalt bike path, subbase, ADA compliant curb ramps, concrete curbs, drainage improvements, signing, striping and pedestrian signals. Work was completed by the end of summer 2020. A fabulous project completed locally.